High Quality Rubber Processing Machine Two Roll Mill

High Quality Rubber Processing Machine Two Roll Mill

High Quality Rubber Processing Device Two Roll Mill

Application:  
The two roll mill is utilised for rubber plasticating, mixing, warming and sheeting.

Functions:

1. Machine body, gland and base are all welded by means of metal plates, right after annealing, entirely processed by exact device tool. The whole machine frame, gland and base are all of powerful rigidity, won’t deform and the area is clean and anti-use.

2. The two finishes of the rolls undertake double roller rolling aligning bearings. CZPTs undertake computerized slim oil lubrication technique. Roll CZPTs adopt automatic slim oil lubrication fashion.

three. Rollers cooling drinking water adopt copper rotary joints. Rollers are produced of chilled forged iron, entrance and rear rollers are hollow type, so as to obtain much better temperature control influence, the functioning surface area hardness is sixty eight ~ 72HSD.

4. Reducer adopts sq. ZSYF355 challenging tooth equipment reducer, six grade precision, really minimal sound, prolonged service existence.

5. Roller bearings: High precision self-aligning roller bearings.

six. Emergency Brake Equipment: In entrance and rear of the device are outfitted with four crisis halting buttons and also in the mill foundation is geared up a Kick-type cease change.

seven. This rubber mixing machine adopts split sort steel stop guides.

eight. Equipment safety products. To defend the machine major elements from injury, the device is connected with safety pads security system. When the device is overloaded, the basic safety disc will rupture guarding the major elements of the equipment from damage.

nine. Our electrical control unit is mostly composed of electric motor, brake solenoid, limit switches and electrical controlling. This unit is put in on the machine foundation (which includes electric powered controlling program) together with the device packed and transported jointly. Just before the device leaving the manufacturing facility, the wire from the motor to electric powered manage cabinet is linked. The client only demands to connect the manage cabinet wire to the electrical power source prior to employing the equipment.

Parameter:
 

Product Roller(DxL)(mm) Entrance Roller CZPT Pace(m/min) Friction Ratio Motor Power
(KW)
Overall Dimension (LxWxH)(mm)
XK-160 φ160×320 eight.95 1:1.37 5.5 1500x750x1500
XK-230 φ230×600 ten.21 1:one.19 fifteen 2800x1200x1120
XK-250 φ250×620 fourteen.1 one:one.17 18.five 3400x1500x1650
XK-300 φ300×750 15.1 one:one.twenty five 22 3500x1600x1700
XK-360 φ360×900 sixteen.twenty five one:one.25 thirty 3780x1850x1750
XK-400 φ400×1000 eighteen.65 one:one.27 37 4350x1850x1785
XK-450 φ450×1200 24.26 one:1.27 fifty five 5200x2380x1840
XK-560 φ560xφ510×1530 27.72 one:1.two 90 5845x2284x1978
XK-550B φ550×1500 27.94 one:1.22 110 5870x2475x2045
XK-610 φ610×2000 28.42 one:1.17 a hundred and sixty 7070x2290x1840
XK-660 φ660×2130 28.6 one:one.24 245 7465x3662x2080
XK-710 φ710×2200 30 1:1.09 280 7500x3500x1800

 
Packaging:
 
Equipment portray concluded just before delivery, and then wrapped with stretch film, keep away from rubbing the paint off the surface area, wooden packaging can be CZPT, key components, these kinds of as electronic manage box, will be wrapped by shockproof packaging resources, and then packed in plywood scenario or container.

 
FAQ
 
one. What does your manufacturing facility do with regards to good quality handle?
We shell out much more significance to top quality manage from the quite starting to the conclude of production. CZPTy machine will be totally assembled and cautiously examined before shipment.
 
two. What is the equipment good quality guarantee?
Top quality promise time is 1 12 months.We decide on world famous manufacturer factors to preserve our device in best operating situation.
 
three. Are you ready to give installation and commissioning abroad?How prolonged time will it consider?
Yes, we can supply overseas service and technological help but consumer wants to spend for the expense of the installation. Small equipment usually normally takes within 2~3 days. Huge manufacturing line typically will take about 30 times.
 
four. How can I trust you to produce the correct device as I ordered?
We will completely provide a great quality device as we reviewed and verified in the get. The core of our business culture is innovation,high quality,integrity and effectiveness. Also we have experienced many great cooperation with globe well-known rubber production makers.
If you appear to our manufacturing facility, we can show the person around us.
 
5. How can we go to your side?
We are situated in HangCZPT CZPT, ZheJiang province, China. The title of airport is HangCZPT liuting airport. We will decide up you at the airport.
 
Our Providers
 
♦ Our engineers can design and style target machines for buyers and ship them the drawing to verify. We are always on the side of conserving your value.
♦ In the method of production, we will take photographs and deliver to consumers for their observe the development.
♦ Files this sort of as packing record, commercial invoice, and invoice of lading etc. will be despatched right after the shipping.
♦ We could provide free of charge English basis DWG, installation drawing, user guide, routine maintenance handbook and part drawing.
♦ We provide abroad engineer support and assist to train your workers to run the machine.

                                                                              Welcome to our manufacturing unit!

High Quality Rubber Processing Machine Two Roll Mill